Projects & Case Studies
Examples of completed Procure Group work, showing how investigation changed the scope of work actually needed.

Bedford
Insulated board system to a cold external wall
Persistent surface mould on a cold solid external wall.
Read case study
Cambridge
Damp-proofing system applied at floor level
Salt-damaged plaster and damp staining low down the wall.
Read case study
Luton
Salt-contaminated plaster removed back to brickwork
Repeated blistering and staining after previous redecoration.
Read case studyHave a similar problem? Arrange an assessment
Upload photographs, describe what you're seeing and our team will advise on the right next step. Prefer to talk? Call us on 0333 335 6152.
